1. Routine Inspection (Weekly/Monthly)
Cleaning and Dust Removal: Wipe the lens and casing weekly with anhydrous alcohol cotton swabs to prevent dust from affecting infrared light penetration.
Seal Inspection: Check the sealing ring monthly for aging and ensure the explosion-proof surface is coated with anti-rust oil (such as type 204).
2. In-depth Maintenance (Quarterly/Semi-annually)
Heat Dissipation and Circuitry: Clean the cooling fan quarterly and check the stability of the power lines to prevent infrared lamp failure due to overheating.
Function Test: Test the night vision effect every six months, confirming that the IR-CUT switching is normal and that there is no color cast in the image.
3. Annual Comprehensive Inspection
Explosion-proof Performance Verification: Annually, a professional organization should test the explosion-proof rating (such as Ex dⅡC T6) to ensure compliance with safety standards.
System Upgrade: Update firmware or replace aging components (such as the DVR fan).
Adjustments for Special Environments
Chemical Plants/Mines: In dusty or corrosive environments, maintenance should be shortened to every 3 months.
Rainy Season/High Humidity Areas: Increase the frequency of seal inspections to prevent condensation.






